10t QTZ160P(6516) Hydraulic Self-Rising Flat-top Construction Tower Crane
1.Flat top tower crane/hydraulic lifting tower crane/flat head tower crane/topless construction tower crane
2. Large Capacity 10t max load, long working radius 65m with tip load 1.6t.
3. China-made high quality tower crane, China good tower crane manufacturers with best price.
4. high efficiency, CE, ISO, GOST certificates, oversea service available
Technical data
The rated lifting moment
|
1600KN.M
|
The max lifting capacity
|
10t
|
The jib length
|
65m
|
The radius
|
3-65(m)
|
The tip load
|
1.6t
|
Main chord
|
200*200*20(angle steel)/135*135*12(square steel)(mm)
|
Mast section
|
2.0*2.0*2.8/2.0*2.0*3.0(m)
|
Slewing angle
|
540°
|
Material
|
Q345B Mn steel
|
Work T
|
-20°C~+40°C
|
Mechanism specification
hoisting
|
Hoisting speed
|
fall
|
|
2
|
4
|
speed
|
m/min
|
33
|
55
|
105
|
16
|
27
|
53
|
Corresponding load
|
t
|
5
|
5
|
2
|
10
|
10
|
4
|
power
|
KW
|
37
|
slewing
|
Slewing speed
|
r/min
|
0.7
|
power
|
N.m
|
5.5*2
|
derricking
|
Derricking speed
|
m/min
|
55/27.5/9.6
|
power
|
N.m
|
5.0/3.7/1.3
|
jacking
|
Jacking speed
|
m/min
|
0.55
|
power
|
KW
|
7.5
|
Power total
|
KW
|
60.5
|
Advantages:
1): the material is Q345B Mn steel, has the superior hardness andtenacity.
2): the lifting mechanism. It adopts coiling frequency motorand mono-speed ratio decelerator, good speed-adjusting performance, steadyoperation and high efficiency.
3): the trolleying mechanism. The range-change structure drivesthe dolly to change range on the horizontal arm, with good positioningperformance
4): the slewing mechanism. Planet gear deceleratortogether with moment-limiting hydraulic coupler, which ensure highload capacity, steady starting and reliable operation
5): the hydaulic increasing mast section mechanism. and can risethe height according to the actual biulding height.
6): the safety devices. It has lifting height limiter, dollyrange-change limiter, moment limiter, weight limiter, slewing limiter, etc
Commercial terms:
Delivery time: 20 workdays after receiving 30% advanced payment
Payment term: 30% T/T in advance, 70% T/T before shipment date
Package: standard packing in 40" HQ container
Trade term: FOB(Qingdao) or CNF or CIF
Warranty: 12 months after the shipment date