Carbon Steel Dual Pille Solar Modules Ground Mounting Structure
Jesfer structure Dual Pille Ground Mounting Structure is designed as mechanics and engineering, height and angle can be adjusted as the actual requirement,which can be installed easily and quickly and provides a stable installation system at lower cost.
System Structure
Advantage
1.Symmetrical Design of Tilt-in-Nut and Rail Channel, Dual-Pile Design, No Drill on Portrait Beam.
,Compatible to Varied Solar Modules.
2. High quality and competitive price. We have more than 15 years of manufacturing experience.
3.We guarantee a 12-year warranty and a 25-year service life, and all parts are fully anodized.
4. Our engineering team are all PhD graduates, with more than 10 years of work experience, and have excellent design capabilities.
5.Each set of brackets is pre-assembled before shipment, which can save about 40% of installation time.
Components Details
Rail
Material:Steel Q235B(hop dip galvanized)
|
C-Shape Pile
Material:Steel Q235B(hop dip galvanized)
|
Inter Clamp Kit
Components: Inter Clamp Rhombus Nut M8
Spring Washer M8
Hexagon Socket Head Bolt
|
End Clamp Kit
Components:Rhombus Nut M8
Spring Washer M8
Hexagon Socket Head Bolt
|
Beam Connector
Material:Steel Q235B(hop dip galvanized)
|
Pile
Material:Steel Q235B(hop dip galvanized)
|
Technical Parameters
System Name
|
Ground Mount System GM12
|
Panel Layout
|
Landscape or Portrait
|
Foundation
|
C-Shape,I -Shape
|
Material
|
Q235B (Hop-Dip Galvanized)
|
Tilt Angle
|
0-60degrees
|
Fastener
|
Hop Dip Galvanized & SUS304
|
Snow Load
|
1.6KN/㎡
|
Color
|
Customized or Silver
|
Wind Load
|
60m/s
|
Design Standard
|
AN/NZS1170,DIN1055,JIS C8955,etc.
|
Applicable Solar Module
|
Framed or Frameless
|
Warranty
|
10 Years
|
Ground Clearance
|
500-2000mm
|
Small Components
|
Anodized AL-6005-T5
|
Installation Guide
1.Install the C-shape Pile based on project solution.
2.Install Inclined Support.
3.The installation of
Inclined Support is done.
4.Install Beam.
5.The installation of Beam is done.
6.Fix the solar module with Inter Clamp Kit & End Clamp Kit.
7.Installation is done.
Business Terms and Other Details of Jesfer Solar:
1).Delivery Terms:FOB, CNF, CIF are available.
For some countries, we can cooperate with DDP, such as Philippines, Malaysia, Thailand, Vietnam, Botswana and so on.
2).Terms of payment:Deposit before production by T/T, The balance shall be paid after inspection and before shipment.
3).Production time:Sample order normally take about 3-7days .and bulk orders usually take about 20-30 days.
4).Time of shipment:
For Southeast Asia:10-15days
For Europe:around 30days
For Africa:around 20-30 days
For the Middle East :around 20-30 days
For South American countries:around 40-50 days
Production and transportation of Bifacial Ground Solar Racking Structure
1).Production:We have a lot of production equipment, for large orders, we can complete production faster than many competitors.
2).Transportation:Our city has international seaport by Xiamen and international airport by Gaoqi, goods can be easily transported to all parts of the world.
Excellent quality made us more competitive in the markets, we are always looking for good partners for long cooperation, if you are interested in High Quality & Free Design For solar panel ground mounting kit, pls contact us right now.Jesfer! Your Best Choice, Your Reliable Supplier!