Product Name: Colshine High Bright 100W 200W 300W LED Shoebox Lights with Photocontrol
Product Description:
For over twenty years, Colshine Electric has been providing customers with cost-effective lighting solutions. Colshine's LED Shoebox - Flood Fixture is just one of the energy efficient products they supply. This LED shoebox fixture is Design Lights Consortium DLC listed and is an excellent, cost-effective solid state LED solution for upgrading your parking lot and area lights. This LED flood fixture comes in multiple color temperatures, wattages, and light distribution for options.
Product Specification:
Power:
|
SMD 50W / 100W / 150W /200W /250W /300W
|
Rated voltage: |
AC 85-277V, 50HZ-60HZ |
RA |
>80 |
PF |
>0.9 |
Lumen: |
100-130lumen/watt |
IP class: |
IP65 |
Certificate: |
ETL, UL , DLC, CE, RoHS, SAA |
Remarks: |
1. include a high quality isolated constant led driver(with surge protection 6KV)
2. OEM ARE WELCOME.
|
Product Details Display:
FAQ:
Q1. how to wire led area lights?
A: First, please check if the led area parking lot lights are with dusk to dawn sensor/dimmable or not . If the light is dusk to dawn sensor/dimmable, then it come with two leads, one for L/N/E, and the another for sensor/dimmer.
Please check the manual carefully before wiring.
Q2.Are you manufacturer?
A: Yes. Our factory is located in Fuzhou. Welcome to visit our factory if your time permitted.
Q3. Do you accept sample order?
A:Sample order is acceptable. Sample can be sent within 1~3 days after payment confirmed.
Q4. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than.
Q5. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q6. How to proceed an order?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.