Fast installed steel bar trusses girder for high rise buildings

Steel truss decking can saving 60 ~ 70% labor cost,so it’s also called speed deck.MOQ:500M²/Size



Steel truss floor decking highlights

☆ Construction period: Steel truss deck can reudce 60-70% steel bars banding quantities,and reduce construction period for each floor;

☆ Quality: Producing by computer numerical control equipment,steel bar distance is evenly arranged and forced;

☆ Convenience: The base sheet and steel rebars of deck truss are previously integrated in factory,which make it easy construction at site;

☆ SafetyIt not only saves labor costs, but also reduces the safety hazards of reinforcing steel bars on site;

☆ Cost reducing: Deck truss can reduce the cost of rented construction machines and construction management cost.At the same time,short construction period also can reduce the final cost.


Steel truss plates application

 High-rise/Super high-rise buildings:

Financial center, commercial building, bank building, office building, etc.


 Long span steel structure buildings:

Art Center, Super Large Gymnasium, International Convention and Exhibition Center, Airport Terminal, etc.


 Buildings with irregular special shape structure:

Architectural design with round,elliptical and other special-shaped steel structures.


Composite floor decking specifications

Product component

Top bars,Bottom bars,Lattice,Bracket vertical bars,Base sheet

Product parameters

Top bars & Bottom bars:Hot-rolled coiled steel bar H R B 4 0 0E ,H P B 3 0 0

Lattice:Hot-rolled coiled steel bar H R B 4 0 0 or Cold rolled round bar with equivalent performance C R B 5 5 0

Bracket vertical bars:Hot-rolled coiled steel bar H R B 4 0 0 ,H P B 3 0 0

Bottom sheets: Q 2 3 5 cold rolled steel sheet;
              S 2 5 0 G D + Z brand galvanized steel sheet.


Zinc coating range: 1 2 0 ~ 275g / m² on both sides.

Product specs

Truss deck

Specs

Bottom sheet width(mm)

600mm

Length(m)

1.0-11.9

Floor thickness(mm)

100-300

Steel truss height(mm)

70-270

Concrete cover thickness(mm)

15Top&Bottom of truss is 15mm)

Base sheet thickness

0.50mm~0.80mm


Concrete slab production & installation video

For more technical data,you can download our catalog.Thank you.


Packing & Delivery:

☆ Packing:

Seaworthy packing standards.


☆ Delivery:

Delivery time for small order with stock material: 7-10 days ;

Delivery time for special requirement,coating types and thickness: 15-25 day;

Delivery term: FOB/CIF/CFR/DDP is available;

We can find good forwarder for customers or accept appointed forwarder from customers.


Product Tags deck truss          deck truss bridge          deck truss definition          pratt deck truss          truss decking sheet          deck truss spacing          steel truss deck          deck truss bridge design          deck type truss bridge         

INQUIRY

Contact us for all information about the product


click here to leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.