For detail pics,pls contact us with free!
GE FANUC IC670MDL640 PLC factory sealed
In most cases, the operator of an extraction turbine needs to maintain both
turbine speed/ load and extraction pressure/flow at constant levels. Changing the
position of either the HP valve or the LP valve affects both turbine speed/load
and extraction. If either the load on the turbine or the extraction demand
changes, both the HP valve position and the LP valve position must be changed
to maintain speed/load and extraction.
Our Advantage
Except Schnieder Quantum,We Supply Siemens ABB Honeywell Bently Nevada,etc Products
Siemens 6DD Series is Hot Sellings,Same As Siemens S7-400 S7-1500 S7-1200
ZheXun is Specialize in PLC Module, DCS Card Pieces, ESD System Card Pieces, etc.
Related Products:
CS1W-ETN21
CS1W-NC233
CS1W-OC211
CS1W-DA08C
CS1W-BC083
CS1W-DRM21-V1
CS1W-CN523
CS1W-CLK23
CS1W-OD212
CS1W-ID211
CS1W-CT021
CS1W-EIP21
CS1W-OC211
CS1W-OD261
CS1W-ID261