Contact me to get the best price:
sales7@amikon.cn 86-18965423501 86-18965423501 AMKPLC
Products Detail:
Brand
|
General electric
|
Part Number
|
IS200TSVOH1BBB
|
Product Type
|
Servo Terminal Board
|
Payment
|
T/T,100% advance payment
|
Shipping Port
|
Xiamen,China
|
Lead Time
|
In stock
|
The GE IS200TSVOH1BBB Relay Termination Board is a critical component within the GE Mark VI control system, designed to manage the connections for relay outputs. This board ensures secure signal termination and reliable communication between the control system and field devices.
Installation:
Mounting the Terminal Board: Secure the terminal board onto a suitable mounting surface using appropriate fixtures or brackets. Ensure the board is positioned securely and aligned correctly for easy access to terminal blocks and connectors.
Wiring Sensors and Servo Valves: Sensors and servo valves are directly wired to two I/O terminal blocks mounted on the board. Each terminal block is secured in place with two screws and features 24 terminals capable of accepting wiring up to 12 AWG gauge.
Carefully connect the sensor and servo valve wires to their respective terminals on the terminal blocks, ensuring proper insulation and termination.
Shield Termination: Locate the shield termination strip attached to chassis ground, positioned immediately to the left of each terminal block. Connect the shield wires from sensors and servo valves to the shield termination strips, ensuring proper grounding for noise suppression and electromagnetic interference (EMI) protection.
External Trip Wiring: Identify the designated connection points for external trip wiring, labeled as JD1 or JD2 on the terminal board. Plug in the external trip wiring to the appropriate connector based on system configuration and requirements.
Cable Management: Organize and manage the wiring neatly to prevent tangling, interference, or accidental damage during operation. Use cable ties or clamps to secure the wires and maintain a tidy installation.
Verification and Testing: Once all connections are made, carefully inspect the installation to ensure all wires are correctly terminated and secured. Conduct preliminary tests or checks to verify proper functionality and ensure that sensors, servo valves, and external trip connections are working as intended.
CALL US: