High Frequency Preheating Machine
Shunhao is specializing in the production of mealmine realated machines & moulds, such as high-frequency preheating machines 5KW ~ 10KW. The products have passed CE certification and have been exported to countries all over the world for over 18 years.
Application:
Melamine Preheating Machine is suitable for melamine, urea plastic, epoxy resin, phenolic resin and other thermosetting molding materials before the resin powder (cake) preheating softening preforming process.
The heating frequency conforms to international standards, heating fast and even!
Suggestions for Preheating Machine
For single color compression machine, 1 melamine powder preheating machine needed
-
150 tons-250 tons machine : 5KW/7KW preheating machine
-
Machines above 300 tons level : 10KW preheating machine
For double color tableware compression machine, 1 or 2 melamine preheating machines needed (according to the requirements of the operation process or the habits of factory workers)
FAQ
1.How to send an inquiry?
You can contact us by E-mail machine@hongancn.com,WhatsApp/Wechat+86 15905996312
2.How long can I get feedback after inquiry?
We will reply you as soon as possible, and normally within 1-2 days.
3.Where is your factory located?
Our factory is located in Quanzhou,Fujian Province,China. Welcome to visit our factory.
4.What's the delivery time for machine?
20-50 days after receiving the deposit, depending on the machine order quantity and machine model.
5.What is the package? Is it safe?
Due to the light weight of the preheating machine, our company uses wooden box sealed packaging, 100% protection of the machine from moisture and collision. However, it should be noted that when loading or unloading the cabinet, the machine must not be allowed to fall. The preheating machine can take the FCL or LCL sea or air way.
The packaging of SHUNHAO factory takes into consideration the transportation safety of machines and molds, reducing your worries about transportation!
6.What is the payment term?
30% by TT in advance & 70% by TT after inspection but before shipment.