Hot sale High quality building construction elevator SCD200/200
SCD200/200 construction hoist/lifts//building lifts//building elevator
Main descriptions and features of SCD200/200 construction hois
1.Equipped with ideal falling preventing device and speed limiter which can avoid the suspension cage falling
overspeedly, thus the suspension
cage falling incident can be eradicated;
2.Mechanical interlocking device ensures people and cargo getting in and out of the suspension cage safely;
3.Performance of transmission system is stable, we have dual drive and three drive with different power;
4.Calling device is available, it can facilitate the operation;
5.Warning system is available, it can avoid safety accidents;
6.Superior quality steel is used which can ensure the quantity and safety of the equipments;
7.Standard sections are welded by using robot which can ensure the stable structure and precise height.
Main technical parameters:
specifications
|
SCD200/200
|
Cage load capacity
|
2000Kg*2
|
Independent height
|
50m
|
Lifting speed
|
33m/min
|
Max. lifting heigh
|
150m
|
Number of passengers
|
24person*2
|
Cage inner dimensions
|
3*1.3*2..4 m ( It can be arranged according to your requirement)
|
section dimensions
|
0.65*0.65*1.508m
|
Power of Motors
|
(11Kw* 3)*2/(15Kw*2)*2
|
CommercialTerms
MOQ: 1set
Tradeterms: FOB (Qingdao) or as per your request
Theabroad market: MiddleEast, South Asia, Africa, Russia, etc.
Deliverytime: 10-15 days after receiving 30% advanced payment
Termsof Payment: T/T or L/C (30% advanced payment, 70% before shipment)
Package:nude in 1*40"HQ containers for basic height (50m)
Warranty:12 months
OurService
----timely delivery, in time shipping notice
----1 year warranty of products quality and full set ofspare parts
----training installation, guidance of operation and maintenance
----engineers have rich experience, can solveall your problems