Modern light steel frame prefabricated house
House Main System
|
S/N
|
Category
|
Description
|
1
|
Main Structure
|
Galvanized light weight steel keel / Galvanized steel pipe
|
2
|
Wall system
|
Embossed metal PU wall panel
|
Water vapor membrane
|
Sandwich panels
|
Rock wool/Fiberglass wool insulation
|
Color steel cladding
|
3
|
Roof system
|
Color steel plates/colorful metal roofing
|
Water proof roll
|
Premium asphalt roof tiles
|
PVC Rain water gutters and down pipes
|
4
|
External Windows
|
Aluminum alloy windows with double insulating glass.
|
5
|
External Doors
|
Security steel door
|
6
|
Fittings
|
Plumbing & Sanitary; Electrical Work
|
Features
1. Steel prefabricated house: no pollution during construction; earthquake and wind resistance; termite proof.
2. All steel structure parts can be made according to clients' requirement: Board for ceiling and wall with various colors and patterns greatly improve appearance of building to meet requirement of client.
2. Low cost, durable structure, convenient relocation and environment-friendly.
4. The material is light, can be recycled and environment-friendly.
5. Easy installation: Five workers can finish one 50m² House for 1 to 3 days.
Technical Parameters
|
Shock resistance
|
Up to 9 magnitude earthquake
|
Wind resistance
|
Hurricane of 70m/s, the resistance level is above grade 12
|
Durability
|
Service life of main structure can be up to 60 years
|
Fireproof
|
Fire resistant time can reach 1 to 4 hours depending on different designs
|
Snow load
|
1500mm
|
Sound insulation
|
The sound insulation performance of exterior wall can be up to 65db,and
the interior wall 45db
|
Application
This product is widely used by carport,hotel,house,kiosk,booth,office,sentry box,guard house,shop,toilet,villa,warehouse,workshop.
Customers are warmly welcomed to visit our factory at any time, even during holidays.
Product display
Packing & Delivery
♦ Packing:
Seaworthy packing standards:
Packed in stack with steel strips,and then loaded in containers.
If you have special packing requirements,please feel free to discuss with us,thank you.
All the steel frame components will be marked for easy installation.
♦ Delivery:
Delivery time for small order with stock material:10-15 days;
Delivery time for special requirements and thickness: 20-30 days;
Delivery term: FOB/CIF/CFR/DDP is available;
We can find good forwarder for customers or accept appointed forwarder from customers.