Spare parts name:Excavator track chain
Application:hitachi Kobelco sumitomo Hyundai Daewoo Kotmasu
Condition:Brand new, ready to be installed
Material:Steel
MOQ:1 PCS
Delivery time
2-5 days for stock, 15-30 days for bulky production.
Warranty:90 days
FOB Port;xiamen port
Payment methods :T/T, L/C, Money Gram, Western Union, Paypal
Supply Ability:500 Pcs / Week
Track links wear when the gap between the pin and bushing is so large that other landing gear components start to wear out. An increase in spacing creates more clearance between the pin and bushing. This makes the inside of the bushing oval and the pin becomes thinner as it rubs against the bushing walls. Since the bulldozer does more moving work, the chassis components of the bulldozer will wear out faster than the chassis components of the excavator. An excellent Excavator Track Link that can improve excavator work efficiency and save maintenance costs.
The wear and tear of the
excavator crawler during work is unavoidable. For an excellent Track link Excavator, its crawler is extremely important. We can provide
high-quality crawler to maximize the service life of the product.