Tension Fabric Design and construction engineering company
Location
|
Iraq
|
Project Size
|
30000 Square meters
|
Fabric Material
|
PTFE
|
Completion Date
|
2012
|
Structure Type
|
Light
|
Warranty
|
1Year
|
Project Summary: The first stadiums to be built in the modern era were basic facilities, designed for the single purpose of fitting as many spectators in as possible. Now AL MENAA Sports Stadium was not only built for sports fitting,but also design for art. Which can accommodate different events, particularly ones with retractable seating.
1.Concept|Design:Creative design solutions.
2.Design-assistance:Provide further design support to architects
3.Engineering:Engineering services provide a special structural examination.
4.Construction|Manufacturing:We are able to deliver on projects because of our skilled fabrication services.
5.Construction Installation:Professional manner and engineer to guide the installation
6.Post-construction services:Include structural reviews, special inspections, routine maintenance, structure modifications, repairs and industrial cleaning of membrane panels.
1).Pre-sell conmunication:Respect the customer's ideas and provide reasonable advice;
2).Professional team:We own a professional design and engeering team with over 20 years experiences;
3).Quality:We have real case show our product can withstand typhoon above level 12;
4).Service:7×24 Hour
5).Price:Same price but higher quality.
Contact now,let us find a solution for you!