The procedure of completed the tensile fabric building for resist super typhoon

How to completed the tensile fabric building for resist super typhoon?

1-The calculation model have to be meet the wind load of local typhoon data;

2-The material have to be chosen according to the reuqirement of deigner;

3-The all procedures of produced have to be done base on code;

4-The packing and transport also have to be carry up base on the code;

5-The procedures of installation have to be done according to the code.


  • Certification

How to completed the tensile fabric building for resist super typhoon?

1-The calculation model have to be meet the wind load of local typhoon data;

2-The material have to be chosen according to the reuqirement of deigner;

3-The all procedures of produced have to be done base on code;

4-The packing and transport also have to be carry up base on the code;

5-The procedures of installation have to be done according to the code.


Product Tags space structures          structure as space          structure of space          space structure          structure space          space structure design          inflatable space structures          structure found in space          giant structure in space         

INQUIRY

Contact us for all information about the product


click here to leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.